Monday, July 19, 2010

Pictures say thousands of words

Hard to believe that in one week, this gate will be open!


These days fly by so fast. That's usually the case when you're having fun ... and that's what we've been having the past several months in as we continue the on-going upgrades to the AirVenture grounds.

Along with everyone at EAA, I would like to sincerely thank our hard-working volunteers who have been lending helping hands over the past few weeks since Camp Scholler opened bright and early on June 25. As you probably know, we've had a little more than enough rain in recent weeks, so it's great to have dedicated individuals come together to pitch in wherever needed. It's another big reason in a long list of what makes AirVenture so special.

I know everyone is getting anxious to get into the grounds and experience AirVenture and all the upgrades. Instead of words, I'm going to let the pictures do the talking. We still have some landscaping and tidying up to do around the grounds (thanks to Mother Nature), but we should be all set to go by the time the gates open next Monday morning.

The new Warbirds in Review presentation pad has an early arrival ...


... and Scotts Warbird Alley has plenty of freshly laid sod ...


... surrounding the new addition to the Warbirds building.


The finishing touches are being applied to the area around and inside the North 40 shower building ...


... which will feature individual shower stalls ...


... as well as private showers accessible through solid doors from the outside.


North 40 residents will enjoy a new bike path from the Main Gate area ...


... leading to the North 40 aircraft camping area.


Expect less dust in several areas, including major roads in Camp Scholler, thanks to chip sealing.


Speaking of Camp Scholler, early arrivals are already making home in approximately 250 campsites with electric and water hookups ...


... and has several of the nearly 50 Wi-Fi stations and hot spots scattered throughout the grounds, like this one at the corner of Knapp Street and Schaick roads.


Exhibits are ready to be filled in this expanded part of Hangar C ...


... which now features indoor restrooms.




I hope you enjoy the improvements, and we'll see you at Oshkosh in a few short days!

Wednesday, June 23, 2010

Counting down the days

Greetings from sunny (and warm) OSH! The sun is back out after a few days of sprinkles (and a shower here and there), and work continues on upgrades to the AirVenture grounds that you all will enjoy. Thanks for your patience with the latest update. Understandably, we are hard at work readying the AirVenture grounds for your arrival shortly.

Hard to believe in just a few short days we will welcome the first campers into Camp Scholler for 2010. Crews are currently putting the finishing touches on some landscaping in advance of this Friday's opening. We're ready for the early birds!

Campers will now be able to plug in toasters or turn the faucet on if they so incline as the campsites with electrical and water hookups are complete. We've added electric and water to about 250 sites, which run 25x50 feet, and remember they are offered on a first-come, first-served basis.

Look for more of these upgraded sites to be added in the future, however we will still preserve areas for traditional campers who opt to "rough it" a little bit more.

Another highlight of our work this season is the expansion of the warbirds area and creation of Scotts Warbirds Alley. Our week-long "Salute to Veterans" is going to be a big one filled with numerous festivities, and this area is going to be a prime location to see warbirds from all eras on display for you to enjoy.

The area is shaping up as the 300x100-foot concrete presentation pad for "Warbirds in Review" is set (as you can see in Bonnie Kratz's photo below). Seeding has recently completed and sod is being laid around the pad and veterans tribute monument.


Speaking of the monument, this will be a sight to behold. Work on this permanent tribute is ongoing, but I don't want to give you too many details. I want you to experience it first-hand. This monument will be an everlasting reminder of the brave men and women who put their lives on the line serving our great country.

The Hangar C expansion recently was the benefit of a significant gift. The Kohler Corporation has generous donated fixtures for the newly installed restroom. This is just another example of the support EAA receives from regional corporations, and we truly thank Kohler for their commitment to making AirVenture enjoyable for all attendees. Additionally, we will be painting the interior steel in Hangar C later this week. You can see exterior of the expansion completed on the right side:


We are progressing with work on the new North 40 shower building that will be completed in time for opening day. Campers will enjoy this new benefit as now they don't have to trek down to the current transient shower to get refreshed.

As some of these other projects wind down, we'll turn our attention to finishing some recently started projects.

Speaking of the North 40, work on the new bike path from the North 40 to the Main Gate began two weeks ago and will be completed in time for AirVenture. This will now give bikers easy access to points between the North 40 and Camp Scholler.

As you can see below, we started the Vicki Cruse Educational Pavilion addition to the south side of the IAC building last week that will help support the aerobatic group's forums. The frame structure and roof are already in place, and this week we are installing the electrical and audio components. Once that's complete, we're then ready to paint and be all set to go.


You can expect it to be less dusty near the internal exhibits and around Paul's Woods that support bus routes thanks to the chip-sealing done on a few of the roads in those areas. This will reduce (but not completely eliminate) some of the dust that can whip up from time to time.

And last, but certainly not least (especially for those looking to stay "online" at AirVenture), we continue to upgrade and expand Wi-Fi coverage as we will now feature 45 Wi-Fi "hot spots" on the grounds. You'll be able to access the Internet or check e-mail whether you're in the North 40, along the flight line, in Camp Scholler, the Ultralight area ... and virtually all points in between. A map of the Wi-Fi locations as well as signs indicating hot spots will be released in the coming weeks.

Time to get back to work out on the grounds. We've got to install new seats and put a fresh coat of paint on the trams. Only a little over a month away remains before AirVenture's opening day. Can you feel the excitement?

Thursday, May 20, 2010

Springing into a lot of action

Even though it's been a few months since I last blogged, that doesn't mean we don't have any site updates to report. With the sun finally shining and the skies clearing (after a very moist April), we've made significant progress on several projects that will enhance everyone's AirVenture experience. Thanks for your patience, and without further ado here are the updates you've been waiting for!

Thanks to our partnership with ScottsMiracleGro, you're going to see many redesigned improvements to the vastly popular Warbirds area with the goal of creating an even better atmosphere. New this year is the Scotts Grass Strip, which will surround a newly expanded area for Warbirds aircraft and presentations. A 300x100-foot concrete pad, allowing for more hard surface parking and taking some pressure off AeroShell Square for warbird aircraft, is over halfway to completion. An addition to the Warbirds building will be completed next week, and will support additional sales opportunities and enhance the registration process. Details of the permanent Veterans Tribute area are currently being wrapped up and, once finalized, it will take about three weeks to construct. With spring in full bloom, landscaping throughout the Warbirds area will begin in the next two weeks.

As you can see in the photos below, all the structural steel for the Hangar C expansion is erected and in place. Next up is putting on the skin, which should be finished by the middle of next week. With the exterior of Hangar C just about completed, we can turn our focus to the interior. The air handlers have arrived and we will soon be working on the interior air system. Construction of the restrooms in Hangar C is also progressing nicely as we will begin work on the plumbing in the next two weeks.





One of the more anticipated amenity improvements to the site is the installation of electrical hookups to some Camp Scholler campsites. I am happy to report that the hookups are up and running in about 250 sites, in plenty of time for the campground's traditional opening day on June 25. All that's left to do between now and then is finish up some minor landscaping on these sites, which are 25 feet wide and 50 feet deep.

These campsites, outlined in the red area below, will only be offered upon arrival and based on a stay through the end of the fly-in, with no refund for unused days. Those who have already purchased camping credentials can upgrade to the improved sites, priced at $42/day, if any are available simply by paying the price difference when they arrive.



We started work this week on the new North 40 shower, beginning with the underground plumbing. After that is completed, we will be pouring concrete in about two weeks. The modular building is currently being constructed and will arrive during the second week of June. From there, we anticipate it should take three weeks to install and be ready to go by early July.

And finally, in the upcoming weeks, we will begin work on putting in a new bike path that will connect the North 40 to the Main Gate area and the existing bike path. This will allow attendees to gain access to various points from the path, including Camp Scholler. This quick project should be completed by the end of June.



We are just a little more than two months away from AirVenture 2010. There is plenty to do before then, but we are confident it will all come together. Check back for more updates and photos soon (we promise)!

Friday, February 26, 2010

The Wheels Keep Turning

Every time we get teased with a couple of warmer days at this time of year, winter reminds us it’s not done yet. It’s nothing that compares to the big snows that hit the East Coast earlier this month, but it’s just enough to move most work inside.

One of the projects that we’re doing indoors is the construction of four new tram trailers to expand and upgrade the AirVenture fleet. These tram units will be larger, carrying up to 40 people. It also means we can begin to replace some of the older units that have served us for many years.


Another indoor project that is under way is the replacement of shelving in the Wearhouse and Sky Shoppe buildings. This is where being a good scavenger comes in handy. EAA has some area members who keep us informed when a building might be torn down or completely remodeled. Many times, old fittings that would be thrown out can be reused in some of our buildings. The shelves came from a couple of those projects, allowing EAA to upgrade the facilities at little or no cost.

While these indoor projects are important, it’s just as vital to be planning for what will happen once the snow melts. One area that will change this year is the site of the old FAA control tower. There is still a lot of old pavement and assorted debris just under the ground surface there. This spring we’ll have the opportunity to redesign that area. We’ll re-route a couple of roads in that area, bury the now-overhead power lines, and move the food area so everything works a little more efficiently.

We’re also signing the contracts to redesign part of the warbirds area. That redesign will allow more hard surface parking and take some of the pressure off AeroShell Square for warbird aircraft, as well as create a better atmosphere for the Warbirds in Review programs, which have really grown in popularity. Some of the warbirds building and stands will also be moved or get a facelift. I hope to have a complete map to show you the details very soon.

The planning on some of the other projects I mentioned last time is also continuing. That includes the electric hookups in Camp Scholler, the new North 40 shower building, the chip-sealing of dirt roads, and Exhibit Hangar C expansion. Several of those projects will get underway as the snow melts and the ground thaws, while the Hangar C expansion will start right after the annual Wisconsin Public Service Farm Show in early April.

Now that we’re on the downhill side of winter, you’ll be hearing from us a little more as the projects take shape. We’ll share photos and other items in the updates as well, so stay tuned!

Monday, January 11, 2010

Pathways to progress

It’s snow covered and cold on the AirVenture grounds, as you would expect in January. But there is plenty going on as we work on the 2010 enhancements to the fly-in site.

Before the ground froze in late November, we finished putting in the electrical work for a nearly 275 campsites in Camp Scholler that will have electric and water hookups in 2010. That is in the same area as the 24-hour generator area was in 2009. It was important for us to maintain the traditional feel of places such as Paul’s Park and the 101 Woods within Camp Scholler while creating areas with upgraded services for those who might want them. All that’s left on the construction side is creating a new well for the sites with hookups.


The exact process of how these sites will be made available is still being determined, so that news should be coming real soon.

Another addition this year is a bike path between the North 40 and the Main Gate area. We’ve had a number of requests for designated pathways for those who would prefer to ride bikes between their campsite and the gate. The bike path will be next to what’s known as Foundation Road in the AirVenture traffic loop, so we don’t create bike/pedestrian conflicts inside the gate. There will also be light towers along the way that will help for that bike path and the parking lots in that area, especially after Theater in the Woods programs or movies at the Fly-In Theater.


Once the snow departs, we’ll be chip sealing a number of roads in the exhibit areas. The chip sealing will lessen the dust on those roadways, but it’s not as expensive as full asphalt, which was really a shock when we saw that estimate. I’ve included a map here that shows the roads to receive the chip seal, as well as where the expansion on Exhibit Hangar C will take place (including restrooms), and extension of some roads within the exhibit area.


Along with all this, we’ve been finalizing plans and getting bids on a variety of projects that will come along in spring. We work with a lot of great contractors in the area who take a lot of pride in the finished product that you’ll see when you get to Oshkosh.

Right now, with the snow and cold, it’s tough to think of how quickly we’ll be on the doorstep of another AirVenture. But it’s less than 200 days away!

Thursday, November 12, 2009

A new countdown, a new list

We spent much of the fall planning “what’s next” for AirVenture site improvements and enhancements. While the list isn’t nearly as long or extensive as what you saw for last summer’s event, it’s still pretty significant and you’ll notice it on the grounds in 2010.

One thing I like about this year’s to-do list is that nearly all the projects relate directly to making everyone’s experience at Oshkosh even better. As we go through the winter, I can give more detail on the projects, but let’s just run through the short list of what we’re planning before the end of next July:

Exhibit Hangar C expansion
-- We’re adding 18,000 square feet of indoor exhibit space to the north side of Hangar C
-- Adding indoor restrooms on the east side of Hangar C, which can be accessed from either the exhibit hangar or from outside

North 40 aircraft camping
-- Building a new shower building along the perimeter road, about halfway between North 40 registration and the current shower building. And yes, the new shower building will also have flush toilets!


Camp Scholler
-- Establishing about 250 electrical hook-up campsites in the area currently reserved for 24-hour generator use. Those sites will cost a little more, and a process for reserving them (either a lottery or other method) will be created in the near future.
-- Maintaining no-electricity areas in some of the traditional camping areas, such as Paul’s Woods and the 101 Woods

Roads
-- Expanding the north/south road between Exhibit Hangars B & D and extending it to Kilps Road, just north of Hangars A & C. This will allow a better, more efficient tram loop to be established that will include a stop at the new restrooms.
-- Chip-sealing roads in the Flymarket area, as well as major roads in Camp Scholler and Foundation Road near the Nature Center. This will help reduce the dust created by traffic and dry conditions.


IAC building
-- Constructing a porch addition on the south side of the IAC building to help support the aerobatic group’s forums during AirVenture

Wow. Along with all that, the Warbirds are currently considering several projects and enhancements in their area, too. Combined with the usual maintenance items, that should be enough to fill our lonely hours throughout the winter and spring. We’re eager to get started and show you the next stage of progress – even if over the winter, it means wearing everything we own to stay warm outside.

Thanks for reading!

Thursday, September 24, 2009

Taking a deep breath

Nearly two months have passed since AirVenture week. In case you ever thought that the grounds fold up and we all go into hibernation after the event, it’s actually a long way from that.

Almost immediately after AirVenture this year, we welcomed about 25,000 Pathfinders youth campers to the grounds for a week. If you thought it was a jammed scene during the fly-in inside Camp Scholler, it was REALLY crazy during that event (shown below), since people aren’t as familiar with the grounds.

This weekend, nearly 10,000 Boy Scouts will be using the grounds for a centennial camporee, while at the same time, we could have 100 semitrailers or more parking throughout the grounds in support of the Special Olympics “World’s Largest Truck Convoy” fundraiser. It’s just part of how the EAA grounds are used for both rental groups and community outreach efforts during the year. August and September are favorite vacation months around here too, of course, after the months of work gearing up for AirVenture.

What you’re really interested in, though, is “How did it go with the new site changes?” Overwhelmingly, I’d have to say great! The new walkways worked just as we hoped, and people really seemed to enjoy the new benches, the additional shade in some areas and so forth. By the way, the 100 benches throughout the grounds were so well-received that we have a commitment for 150 more of them. That’s good news.


I can say that with the increased attendance this year, it would have been much more difficult for people to move around if we hadn’t made the changes. One never knows how things will work until everybody arrives, but a large majority of people seemed very happy with the new configuration.



As with any new layout, there were a few things that we learned in 2009. Some places need more dumpsters. The new traffic loop created a couple of new bottlenecks to be solved, such as near the Red Barn store in Camp Scholler and near Theater in the Woods. The new flush toilets on the grounds created a demand for – you guessed it – more flush toilets.


We’ve been going through all the feedback and our own observations to make plans for 2010. In some ways, I wanted to get going right away on next year’s plans, because the past month has been about as perfect as one could want for outdoor work. But sometimes, you have to wait for the final decisions to be made. We are working on areas where some of the new grass that was planted needs a boost, with overseeding and aerating those areas.

We’re also studying what gravel roads should be paved for 2010. Traffic, dust problems and drainage are among the considerations when making those decisions. The projects for 2010 might not be as big as what we did for this year’s event, but we’re always hoping to make a step forward. The success of AirVenture this year will help us do that. Thanks again for reading, and we’ll stay in touch!